38mm wastegate:
50mm blow off:
We gusseted the front subframe:
Then we cut the room for larger tires on the front:
Turbonium:
Then cleaned up the oil pan for welding:
The first blood of the project:
The rear brakes being rebuilt:
The flash caused a white wash so Josh looks like Casper...lol
